Eliminating Moisture: Flooring’s Arch Rival
In the final stages of a recent project, we discovered that our concrete slabs had elevated moisture content as compared to the specifications required by the desired floor coverings. This persisted in spite of running the HVAC system for 30 days, our standard operating procedure. Was their storm water matriculating through sub grade? Was there a …